P6

Tab 1

  • SC AVENSA CONSULTING SRL

  • Romania

  • Suceava Municipality

  • The Regional Operational Programme Structural Funds POR 2007 - 2013

  • 07.04.2009 - 03.09.2009

Tab 2

Urban Development Integrated Plan in Suceava Municipality

Reducing disparities between less developed and developed areas of the city through accessibility and mobility in safe conditions and supporting the economic development in order to support the position of the development pole Suceava through:

*Rehabilitation of roads, bridge and tunnel, modernizing parks and creating modular stations for public transportation in the municipality of Suceava

*Rehabilitation of the central area of the municipality of Suceava by creating underground parking, pedestrian facilities and road rehabilitation

*Modernizing public lighting on the main artery of the municipality of Suceava

*Bucovina traditions support centre

*Increase safety and prevent crime in the municipality of Suceava, by means of the acquisition of specific equipment and setting up a surveillance center

Tab 3

Drafting the Integrated Urban Development Plan according to the funding guidelines for Axis 1.1 of POR