GOLIA

Tab 1

  • SC AVENSA CONSULTING SRL - general contractor; SC GENESIS SRL - subcontractor

  • Romania

  • Iasi Municipality

  • Structural Funds POR 2007 - 2013

  • 24.11.2010 - 8.01.2011

Tab 2

Rehabilitation of Golia Monastery, stage II

The project is designed as a continuation of the restoration project of Golia Monastery, completed in 2010. This restoration project was focused on Golia monastery’s church, interior walls and towers.

The main purpose of this project is to develop visibility for the site and the monument in Iasi, creating an infrastructure that would highlight this monument and allow a tourist route between other monuments in the historical centre of Iasi and Golia Monastery. Within the investment, is taken into account the rehabilitation of some urban areas neighbouring Golia Monastery for the enhancement of this historic ensemble.

Tab 3

DALI preparation according to GD 28/2008, including cost-benefit analysis;
Preparing geotechnical studies;
Preparing topographic studies;
Preparing technical expertise for Golia and George Enescu Streets+M21;
Drafting the documentation for obtaining approvals.