Tab 1

  • S.C. AVENSA CONSULTING S.R.L.

  • Romania

  • Moinesti Municipality

  • Structural Funds POR 2007-2012

  • FS: 21.01.2009 - 27.03.2009; TP: 14.12.2009-13.01.2010

Tab 2

Rehabilitation of an existing building for the purpose of transforming it in a social centre in Moinesti Municipality

 

The overall objective is the rehabilitation of urban infrastructure in Moinesti, thus contributing to the implementation of social interventions for disadvantaged groups to improve the attractiveness of the North-East Region, to increase quality of life and create jobs by making a plan to reuse a damaged building and prepare it for new types of social activities.

The specific objective of the project is the implementation of social services for children, the elderly and other groups through the renovation of the degraded building in Str. Capt. Zaganescu no. 2 in a total area of 1992.81 sqm, in Moineşti, in order to reuse it as an integrated complex of social services for children, the elderly and other disadvantaged groups for a 26 months period of time:

  • Renovating the ground floor of the building with total built area of 664.27 square meters for the reuse for social services, changing the destination into a day center for children.
  • Renovating the first floor of the building with total built area of 664.27 square meters for the reuse for social services, changing the destination into an emergency reception center (night shelter)
  • Renovating  the second floor of the building with total built area of 664.27 square meters for the reuse for social services, changing the destination into a residential center for the elderly.
  • purchasing 132 equipment items for Day Centre for children;
  • purchasing 139 equipment items for the Emergency Center of homeless (night shelter);
  • purchasing equipment for 203 residential centers for the elderly.

Tab 3

Drafting the Economic and technical documentation (feasibility study, including certified checks on specialties, specifications, construction details, approvals, DTAC);
Performing investment studies: topographical survey, geotechnical survey, technical expertise, energy audit;
Ensuring technical support during the performance of work until the final acceptance report;