Construction of a wind farm consisting in 4 wind turbines (Corni 1, Corni 2, Varlezi 1, Varlezi 2) and of the related electrical connection in the villages Corni and Varlezi, Galati.

The specific objective of the project is to ensure the viability of business investment electrical energy production from renewable wind sources (E-SRE) with production capacity of a wind farm consisting of 4 wind turbines and associated electrical connector that ensures safe operation, lower production costs and losses.

Tab 3

Drafting the feasibility study.
Performing the cost-benefit analysis.
Elaborating the documentation for the  grant application.